RAP display the virtual office

RAP exhibited at the 20/20 to show their complete aptitude and capabilty to build an office on site. The event was extremely successful providing essential exposure for our company. The office itself consisted the core build materials for the modern office.

Walls: emulated TENON 75mm partition along with a double glazed section with integral blind, end wall section 12mm polar glass section.

Ceiling: constructed of 600x600mm grid with re-cessed lighting and a curved end section fitted with colour changing LED downlights.

Carpet: Heuga interface in Sycamore Green.

The stand is built in a modular form to allow the re-build, re-decoration, re-use as required fo future events . With thanks to Balreed Digitec for partnering with us on the day and providing the state of the art desk and chair and functioning photocopier - Tenon for supplying the paritition materials - BGF Contract Flooring for the carpets - Hallmark Signs for all the graphic signage.